Skip to main content
Skip table of contents

Mass Deployment Using a Scheduled Job

This scenario is appropriate if you already have a working environment with IGEL OS 10.05.800 (or higher) and want to update all devices to IGEL OS 11 at a defined time.

Read all the following chapters carefully and follow the instructions.

  1. Checking the Requirements

  2. Creating a Profile

  3. Deploying the Licenses

  4. Assigning the Profile

  5. Creating the Scheduled Job

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.